7/1/2018 loading scaffolding and plywood on truck
7/2/2018 Scaffolding construction begins. It all bolts together.
7/2/2018 scaffolding bolts together
7/2/2018 Look whats behind door #1...more siding under first layer
7/2/2018 first lower layer of T1-11 siding removed
7/2/2018
7/3/2018
7/3/2018 hmmm.. no insulation in the wall
7/3/2018 getting someone to mow down some blackberries...free was a good price
7/3/2018 gained about an 8ft strip of space for parking
7/4/2018 lower 2 layers of siding removed
7/4/2018 need to add more scaffolding to reach upper area next
7/9/2018 Chuck puts in som enew skirting
7/9/2018 Chuck does some foundation repairs
7/9/2018 New & primed skirting
7/9/2018 ...the mice ate all the insulation in the walls?
7/9/2018 lower part of wall ready for repairs
7/10/2018 Start building the upper section of scaffolding
7/11/2018 lifting up two boards bolted together
7/11/2018 two boards in position
7/11/2018 .. slowly it gets put together by just 1 person
7/11/2018 horizontal boards getting added
7/11/2018 ...verification of which church this is :)
7/11/2018
7/11/2018
7/11/2018
7/18/2018 starting to remove more upper siding
7/18/2018
7/18/2018
7/18/2018
7/19/2018 More upper siding removed
7/19/2018
7/19/2018 New studs added in wall
7/19/2018 Upper siding almost removed
7/20/2018 Its over 25 ft up there
7/20/2018 New insulation going in
7/20/2018 First sheet of plywood
7/20/2018
7/20/2018
7/20/2018
7/20/2018