• 7/1/2018 loading scaffolding and plywood on truck

  • 7/2/2018 Scaffolding construction begins. It all bolts together.

  • 7/2/2018 scaffolding bolts together

  • 7/2/2018 Look whats behind door #1...more siding under first layer

  • 7/2/2018 first lower layer of T1-11 siding removed

  • 7/2/2018

  • 7/3/2018

  • 7/3/2018 hmmm.. no insulation in the wall

  • 7/3/2018 getting someone to mow down some blackberries...free was a good price

  • 7/3/2018 gained about an 8ft strip of space for parking

  • 7/4/2018 lower 2 layers of siding removed

  • 7/4/2018 need to add more scaffolding to reach upper area next

  • 7/9/2018 Chuck puts in som enew skirting

  • 7/9/2018 Chuck does some foundation repairs

  • 7/9/2018 New & primed skirting

  • 7/9/2018 ...the mice ate all the insulation in the walls?

  • 7/9/2018 lower part of wall ready for repairs

  • 7/10/2018 Start building the upper section of scaffolding

  • 7/11/2018 lifting up two boards bolted together

  • 7/11/2018 two boards in position

  • 7/11/2018 .. slowly it gets put together by just 1 person

  • 7/11/2018 horizontal boards getting added

  • 7/11/2018 ...verification of which church this is :)

  • 7/11/2018

  • 7/11/2018

  • 7/11/2018

  • 7/18/2018 starting to remove more upper siding

  • 7/18/2018

  • 7/18/2018

  • 7/18/2018

  • 7/19/2018 More upper siding removed

  • 7/19/2018

  • 7/19/2018 New studs added in wall

  • 7/19/2018 Upper siding almost removed

  • 7/20/2018 Its over 25 ft up there

  • 7/20/2018 New insulation going in

  • 7/20/2018 First sheet of plywood

  • 7/20/2018

  • 7/20/2018

  • 7/20/2018

  • 7/20/2018